Provident Design & Build LLC • Florida Certified General Contractor CGC1525154561-320-4000  •  john@providentdesignbuild.com
Permit Resolution

Open Permits, Expired Permits & Difficult Permit Problems

When a permit is holding up a sale, refinance or new project, the first job is to determine exactly what is missing.

Permit problems are rarely solved by guessing.

We start with the permit record, inspection history, approved plans if available, property information and existing conditions. From there, we determine what appears to be preventing the permit from moving forward.

Typical resolution process

01

Research

Review permit records, inspection history and available approved documents.

02

Site review

Compare the record with actual construction when field verification is necessary.

03

Gap analysis

Identify missing drawings, inspections, letters, engineering or corrections.

04

Closeout path

Prepare or coordinate the documentation necessary to move the matter forward.