Legalizing Existing Work

After-the-Fact Permit Drawings

When construction already exists, the permit package has to address what was actually built — not what someone remembers intending to build.

Document, investigate, then determine the path

After-the-fact permits may require existing-condition drawings, engineering evaluation, product information, photographs, selective demolition and inspections. Requirements vary significantly by jurisdiction and by the type and age of the work.

01

Research

Review records and determine whether any related permits or plans already exist.

02

Field document

Measure and photograph accessible existing construction.

03

Identify evidence

Determine what cannot be verified without additional investigation or opening finishes.

04

Prepare package

Develop or coordinate the documents needed for the permit path identified.